An Interstate 285 bridge joint gap brought traffic to a halt on Saturday evening after Smyrna police photographed the pavement damage, WSB-TV Channel 2 – Atlanta reported.
Motorists sat stuck on the highway for hours during the emergency closure. Cellphone video captured backed-up traffic alongside drivers and passengers stepping out of vehicles to walk along the interstate.
“We had a small child in front of us and they had to get out to use the restroom because there was nowhere else to go,” driver Michelle Earl told WSB-TV Channel 2 – Atlanta.
Federal records reviewed by WSB-TV Channel 2 – Atlanta show that components of the bridge joint had documented problems. Compression joint seals designed to keep water and debris out of the bridge joint have been rated in severe condition since 2024.
Despite those severe component ratings, the bridge built in 1968 holds an overall structural rating of fair according to federal data. Georgia Department of Transportation inspectors found spalling at the bridge joint, which occurs when concrete or pavement chips, flakes or breaks away.
“The bridge has no structural defects,” GDOT spokesperson Natalie Dale said, adding that the issue does not affect the bridge’s structural integrity.
Dale compared the unexpected damage to home maintenance issues that occasionally demand immediate attention. Earl expressed relief that authorities managed to stop traffic before vehicles crossed the damaged section, calling such road hazards one of her biggest fears.
Crews completed temporary repairs over the weekend after GDOT dispatched inspectors to the scene. Transportation officials said that permanent repairs are expected to take place next month.
The Georgia Department of Transportation, as the agency charged with developing and maintaining all state and federal roadways in Georgia, holds authority to close interstate bridges on an emergency basis when inspectors identify immediate safety hazards such as the spalling found at the I-285 bridge joint.
GDOT’s inspection program follows federal standards that rate individual components — such as compression joint seals — on a scale where “severe” indicates a critical defect requiring urgent action, while the bridge’s overall structural rating of “fair” reflects an aggregate assessment that the primary load-carrying elements remain sound despite localized deterioration.
Crews will return to inspect the bridge deck joint again from 6 p.m. on Monday to 6 a.m. Tuesday, and once more starting at 8 p.m. Tuesday night until 6 a.m. on Wednesday.