Maxwell Theatre Closes Dec. 7 for $1.5M Renovation, Reopening Expected April 2027

Augusta University will close its Grover C. Maxwell Performing Arts Theatre on Dec. 7 for a $1.5 million renovation that will replace every seat, overhaul technology and remodel restrooms in the lobby and backstage areas.

The project is expected to keep the 58-year-old venue dark for about five months, with construction scheduled to finish by the end of March 2027 and audiences returning in April.

“This renovation will help modernize the facility and bring meaningful improvements to our audience experience,” said Jeffrey Keenan, the university’s assistant vice president for student affairs facilities. “When the theater reopens, our students, campus partners and community guests will benefit from a venue that is better equipped to support performances, events and engagement opportunities for generations to come.”

Crews will remove all existing seating and install new seats designed with comfort in mind, one of the most visible changes patrons will notice. The current sound system will be relocated to a dedicated booth inside the theater to modernize how performances are mixed and run. Work also covers a comprehensive technology upgrade and renovations to restrooms both backstage and in the lobby.

Maxwell theatre au
Photo: augustanewsroom.com

The scope points to a modernization rather than a full replacement of the facility. Wisevoter notes that the final renovation budget beyond the $1.5 million estimate has not been specified.

Maxwell Performing Arts Theatre. The venue has served as a gathering place for the university and community for almost six decades, according to Augusta Business Daily.

University official Jeffrey Keenan highlighted the theatre’s long-standing role in a statement reported by Augusta Business Daily. He emphasized that the renovation aims to modernize the facility and improve the audience experience for future generations.

The relocation of the sound system is part of a broader technology overhaul included in the $1.5 million renovation project.

Opened in 1968 as Augusta’s first dedicated arts venue, the Grover C. Maxwell Performing Arts Theatre was built with $1 million in funding secured in 1965, replacing makeshift performance spaces like the Chateau, a former horse stable.

Its design, an enduring testament to creators like Harry Jacobs, has changed little in five decades, and in 1986, it welcomed the Cultural Triad, a bronze tribute to art, theater and music, now standing before the theater.

The theater regularly hosts university performances and community events. Those shows will pause during construction and shift to other venues in the CSRA, though specific locations are still being finalized. Patrons with events planned between December 2026 and April 2027 are advised to watch for updated venue listings as the university confirms where displaced shows will land.