This dedication isn’t just about naming space; it anchors a 36-year commitment by Cosgrove to the Black Bears program, a legacy now physically integrated into the campus athletic infrastructure.
Greg Powell, Executive Chairman of the Harold Alfond Foundation, noted this tribute is deserved because of how deeply Cosgrove cared for the University of Maine and its people.
The first floor corridor will connect directly to the Walt Abbot Sports Performance Center.

Cosgrove dedicated 36 years to the University of Maine through playing, coaching, and senior administration, culminating in his induction into the UMaine Sports Hall of Fame in 2021 and the Maine Football Ring of Honor in 2026.
His 129 wins over 23 years surpass any other coach in program history.
He guided the Black Bears to three conference championships and five NCAA postseason appearances, and his teams achieved their first-ever victories over Football Bowl Subdivision competition with wins at Mississippi State in 2004 and at UMass in 2013.
Cosgrove didn’t just build field success; he fostered classroom achievement, with the program hitting NCAA Academic Progress Rates above 950 during his final decade, including a 980 mark in 2008-09.
Jude Killy, UMaine Director of Athletics, stated,
“We believe that we are putting all the pieces in place to make sustained runs at postseason play in college basketball, and Morse Arena is right at the center of that.” UMaine Director
The new arena complex not only houses the football operations center, including staff offices with direct stair access to Morse Field, but also provides modern locker rooms, a film room, and dedicated nutrition areas for both men’s and women’s basketball teams.
The Rodney Sparrow Family football office space, which holds all football coaches’ offices and conference rooms, is set up on the second floor of the wing, and construction will begin after the 2025 fall semester with the building expected to be completed and in use during the 2027-28 basketball season.