Vancouver’s New St. Paul’s Hospital Opens Early 2027 With Private Rooms, Four-Zone ED, Research Campus

Vancouver’s new St. Paul’s Hospital will open in early 2027 with every inpatient in a private room, a four-zone emergency department and a connected research centre slated for 2029.

The Jim Pattison Medical Campus will house the replacement hospital and the adjoining Clinical Support and Research Centre (CSRC), linked by a skybridge, Hospital News reported. The campus is designed to improve access, privacy and healing while accelerating the path from discovery to bedside care, drawing comparisons to the Mayo Clinic and Johns Hopkins.

“Designed with patients and families in mind, thoughtful spaces, advanced medicine, and smart technology come together to create a more personal hospital experience,” the report said.

The Teck Emergency Department will run registration and triage simultaneously to cut wait times. A pod model splits the ED into four zones, each operating as a mini emergency department, including one dedicated exclusively to mental health patients. A separate ambulance entrance aims to support a calmer environment. More patients will be assessed in single-occupancy or secluded exam rooms, reducing time in central waiting areas.

Every inpatient room will be single-occupancy with a private bathroom, space for a family member to stay overnight and a bedside tablet for communication and environmental controls. The Neonatal Intensive Care Unit follows the same model, letting parents and babies remain together.

Operating rooms will be up to 30 per cent larger than existing suites to accommodate advanced procedures. The campus provides more than 1,100 parking stalls and over 100 electric-vehicle chargers, and sits a four-minute walk from Main Street–Science World SkyTrain Station.

The PA Woodward Foundation Care Coordination Centre — a first in British Columbia — will coordinate a patient’s journey from admission through discharge. The Shinozaki Family Centre for Healthy Aging will serve as BC’s first centralized hub for seniors care, connecting geriatric specialists, outpatient services and community supports under a “no wrong door” approach. Purpose-built spaces include a simulated home and a mobility gym for real-world assessment.

St. Paul’s Hospital, the oldest of Providence Health Care’s 18 facilities, has served as a provincial referral and tertiary care centre since the 1970s, housing North America’s largest addiction fellowship program and the Pacific Adult Congenital Heart Clinic. That legacy now operates across multiple buildings and levels in a Centre Block lacking fire sprinklers and seismic upgrades, with the radiology department a significant distance from the emergency room.

Since 2010, redevelopment advocacy has targeted those constraints, culminating in the 2020 sale of the downtown site to Concord Pacific for nearly $1 billion to fund the False Creek Flats replacement.

The CSRC, scheduled to open in 2029, will house a Clinical Trials Unit running Phase 1–3 studies, including first-in-human trials — a BC first outside of oncology. Expanded biobanking capacity will build on the hospital’s existing heart and lung tissue collections, the largest in Western Canada.

An Innovation Centre floor will host 3D bioprinting and advanced data analytics, while a Simulation & Experiential Learning Centre will sit alongside the trials unit to train teams and test new health technologies before clinical use.