Boise Airport is planning a new concourse and baggage system to handle passenger traffic that has nearly doubled since 2015, The Arbiter reported.
The airport served 5.23 million passengers in 2025, up from roughly 2.98 million a decade earlier, Shawna Samuelson, the airport’s air service and marketing manager, wrote in an email to The Arbiter. “Our current terminal was built to accommodate approximately half the number of passengers we serve today,” Samuelson wrote. “The expansion program is necessary to better serve today’s travelers and prepare our facilities for the region’s projected growth.”
Gates during peak periods and overnight aircraft parking are typically at or near capacity, Samuelson said, though the airport has accommodated all service proposed by its airline partners.
The BOI Upgrade program calls for Concourse A with up to 10 gates, larger waiting areas, additional concessions, a new baggage handling system and a central utility plant. The construction agreement carries a $700 million ceiling, a contractual limit rather than a final cost, with individual packages going before the Boise City Council as designs progress.
“Our current terminal was built to accommodate approximately half the number of passengers we serve today. The expansion program is necessary to better serve today’s travelers and prepare our facilities for the region’s projected growth.”
Funding will come from airport revenue, airport revenue bonds, passenger facility charges, rental car customer facility charges and federal grants. Samuelson said the airport does not use local taxpayer dollars for capital projects or operating expenses.
Southwest Airlines will add seasonal nonstop service to Nashville on Saturdays from June 5 through July 31, 2027, part of the carrier’s broader Nashville expansion, according to an Oct. 6 BoiseDev report. Airlines ultimately decide which routes to offer based on demand, aircraft availability, operating costs and network connections, Samuelson said. The airport supports those decisions by providing data on regional population growth, travel patterns, local business activity and tourism.
Carrie Hughes, executive director of Visit Boise, said nonstop service makes the city more accessible by eliminating connections. “But I think taking that barrier out of having to stop somewhere definitely is an attractive piece,” Hughes said. She said easier access can support visitor spending on hotels, restaurants, transportation, entertainment and shopping, though she did not provide an economic impact estimate for the Nashville route specifically.
Boise State students and their families may benefit from fewer connections and more travel options during academic breaks as additional routes are added, Samuelson said. Extra capacity could allow airlines to schedule service during peak periods such as semester transitions, Thanksgiving, winter break and spring break.
Projects already finished include public and employee parking garages and the Rental Car Center, which opened in September 2026 and connects to the terminal by a covered walkway. Planned upgrades include more seating, restrooms and concessions, improved baggage processing and more reliable heating and cooling systems. The airport is updating its master plan to assess infrastructure needs over the next 20 years.
Completion dates have not been finalized as the airport and its general contractor develop the construction schedule. “The current expansion is designed to address forecast passenger demand while providing flexibility for continued growth,” Samuelson wrote.
Worth a look
- Oregon High School Football: Round 3 Predictions, 6A Columbia Cup Final Set
- Tyson Grant, 27, Arraigned on Open Murder Count in Brother Trenton’s Death
- Inflation Since October 2024 Adds About $4,720 a Year to Household Costs (daybreakwire.com)
- Netherlands Plans Youth Helmet Mandate for E-Bike Passengers From September 2027 (archyde.com)