Cerebras Systems Opens Data Center in Oklahoma City

Cerebras Systems announced in September 2025 that it had opened a data center in Oklahoma City, the company said. Cerebras Systems opened a 10 MW data center at 512 NW 62nd St. in Oklahoma City in September 2025, occupying an 82,000‑square‑foot building originally built for Chesapeake Energy. Scale Datacenters prepared the site and infrastructure for Cerebras, according to datacenterdynamics.com. The property was acquired from natural‑gas producer Expand Energy earlier in 2025, datacenterdynamics.com reported. The center houses Cerebras CS‑3 systems powered by the Wafer Scale Engine 3, which the company describes as the largest processor ever built — 56 times larger than the largest GPU — and CEO Andrew Feldman said the facility delivers more than 44 exaflops of AI compute and supports the largest models yet invented. The site reportedly contains 1,400 trillion transistors and 315 million AI cores, datacenterdynamics.com reported.

Cooling is handled by a direct‑to‑chip liquid system in a closed loop that minimizes water use, and the facility uses outside air for cooling except when temperatures are too high, newson6.com reported. Cerebras said every kilowatt‑hour consumed is matched with renewable energy, datacenterdynamics.com reported. The building features Tier III‑quality infrastructure, tornado and seismic shielding, and triple‑redundant power stations, newson6.com reported.

Colliers sales brochures showed the facility previously spanned 56,250 square feet with 2.9 MW of IT capacity across 12,000 square feet of raised floor, datacenterdynamics.com reported. Cerebras has inference clusters operating in Santa Clara and Stockton, California; Dallas, Texas; and is rolling out sites in Minneapolis, Minnesota; Montreal, Canada; and undisclosed locations in the U.S. Midwest and Europe, datacenterdynamics.com reported.