Donalds Pushes Florida Nuclear Revival Despite Utility 10-Year Gap

Florida Gov.-elect Byron Donalds pushes a nuclear revival that a state review says would fall beyond the current 10-year planning period.

Florida Gov.-elect Byron Donalds faces a decade-long gap between his nuclear revival goals and industry reality.

  • Florida utilities have no nuclear build plans for the next decade.
  • Donalds calls nuclear “cheap, green and affordable.”
  • Solar generation is set to more than double in Florida.
  • Advanced nuclear projects face regulatory and cost hurdles.

GOP Gov.-elect Byron Donalds is championing a nuclear power renaissance for Florida. He told reporters this month in Tallahassee that nuclear energy is “cheap, green and affordable.” Donalds, one of the House’s top nuclear energy advocates, said the state must lay the groundwork for advanced reactors.

He pledged to advance nuclear energy at the state level while working with other governors and the next congressional delegation to update regulations.

“The data is there. The technology is there. The regulations have to catch up with that,” Donalds said. “We’re going to make sure that we do everything we can from the state level to do that, but also making sure that the feds have the right desire from states like a Florida saying, ‘We need to do this so we can stabilize the energy costs.’”

Photo: yahoo.com

Despite Donalds’ ambitions, Florida’s largest utilities are not on board for the short term. Florida Power & Light, which owns the only operating nuclear plants in Florida, has a dedicated team evaluating small modular reactors, or SMRs, and plans to begin early permitting for a small reactor near one of its existing plants.

Any resulting unit “would be beyond the current 10-year planning period,” according to a state Public Service Commission review.

FPL spokesperson Andrew Sutton said the team is “examining a number of different technologies carefully” to deploy the right technology “as soon as one becomes viable and cost effective.”

Byron Donalds Pushes Florida Nuclear Power Revival Amid Industry Challenges #news #new #latestnews — USA News Pulse

Another major utility, Duke Energy Florida, currently has no nuclear plans. Its spokesperson, Ana Gibbs, said the utility’s “Ten Year Site Plan proposes new solar and upgrading existing generation units,” adding that “advanced nuclear overall is still a longer-term option.”

Florida’s utilities are expanding their solar base instead, even as top state Republicans express hostility to renewables.

Advanced reactors, which use innovative technology like smaller sizes or alternative fuel compared to the 90-plus traditional reactors the U.S. already relies on, face significant regulatory, cost, and timeline hurdles. Small modular reactors, about one-tenth the size of a traditional reactor, produce between 50 and 350 megawatts of energy, while microreactors produce less than 50 megawatts.

While nuclear energy has gained bipartisan momentum, the U.S. still has no commercial small modular reactors or microreactors in operation. A handful of projects are under development nationally.

In Florida, nuclear energy generation is expected to decline slightly in the next decade, while solar generation is predicted to more than double, the PSC review found. The state has flirted with expanding nuclear technology, with lawmakers proposing a bill to encourage advanced reactor development and previous legislation directing the utility regulating body to study nuclear feasibility.

“There aren’t sort of active discussions, but Florida is beginning to show more interest,” said Kristy Hartman, senior director of state policy and external affairs at the Nuclear Energy Institute. The industry is attracted to states that develop a regulatory framework and explore sites for projects, she said.