- HDB proposes retaining 13ha of nature, including 8ha of coastal habitats and 5ha of terrestrial greenery, on a 36ha study area.
- Public feedback runs from Nov 23 to Dec 20; the full EIA report is published on HDB’s website.
- Alternative brownfield sites at Siglap Secondary School and Lorong Halus were assessed but deemed unavailable in time.
- Recent Pasir Ris BTO projects saw application rates of 3.4 for 4-room and 6.3 for larger flats from first-timer families.
The Housing and Development Board unveiled Pasir Ris Neighbourhood 3 plans proposing to retain 13 hectares of coastal habitats, preserving 22.2% of suitable land animal habitat and creating a 150-metre buffer.
The Housing and Development Board said the conceptual plan for Pasir Ris Neighbourhood 3 was shaped by an Environmental Impact Assessment covering terrestrial, mangrove and intertidal zones, and by feedback from nature groups.
Under the plan, about 8 hectares of intertidal areas, seagrass meadows and mangrove ecosystems will be preserved, while 5 hectares of vegetation will act as a buffer for the mangroves and an existing stream, HDB said in a Facebook post.
“The public consultation will run from Nov 23 to Dec 20, with HDB saying it will ‘carefully consider the public feedback received, alongside the EIA findings, housing needs, infrastructure requirements and technical feasibility’,” CNA reported. The full EIA report has also been published on the HDB website. The site sits at the eastern edge of Pasir Ris Town, bounded by Pasir Ris Drive 3, Pasir Ris Drive 4, Jalan Loyang Besar and Sungei Loyang. About 20 hectares are slated for housing and amenities. The Business Times noted the land has been reserved for residential use since the 1980 Master Plan, “with this planning intention reaffirmed at each subsequent Master Plan review conducted every five years.”
HDB said it prioritised brownfield sites but found none suitable nearby within the required timeframe. The former Siglap Secondary School grounds and industrial areas at Lorong Halus are already planned for other housing supply or national uses, or cannot be made available in time, the board said. AsiaOne reported HDB stating there are “no available brownfield sites that can provide a similar amount of housing within the required timeframe.”
The EIA, conducted by Tembusu Asia Consulting, recorded 254 animal species, 159 terrestrial plant species and 26 mangrove species across the 36-hectare study area, The Straits Times reported.
These include the critically endangered greater mousedeer and Sunda pangolin — both believed to have swum over from Pulau Ubin — as well as two mature trees of the native mangrove hybrid berus mata buaya. The Straits Times added that retaining the 13-hectare area will preserve 22.2% of suitable habitat for land animals and create a 150-metre buffer. HDB plans a 15-metre-wide linear park along Sungei Loyang, heavily planted to support biodiversity and to host the National Parks Board’s Round Island Route. Green buffers and walking paths will also line the northern, western and southern boundaries. An Environmental Monitoring and Management Plan will guide construction to safeguard surrounding habitats, the board said. Strong demand underpins the push. The last BTO launch in October 2024 — Costa Riviera I and II — drew application rates of 3.4 for four-room flats and 6.3 for five-room and three-generation flats among first-timer families, according to 99.co.
The Business Times added that the executive condominium Coastal Cabana sold 498 of 748 units at an average of S$1,734 per square foot at its launch in January 2026. Eugene Lim, a key executive officer of ERA Singapore, told The Straits Times that with a gross plot ratio of 2.1, residential developments could reach 24 storeys.
He noted the site is about 900 metres from both Pasir Ris MRT station and the upcoming Loyang station on the Cross Island Line, set for completion in 2032. More homes are also planned next to Pasir Ris MRT station on the former bus interchange site, and a new community hub for the town centre is in the works. HDB said it will refine the development footprint, housing yield, density and mitigation measures after the feedback period.