INL Computing Facility Designated First DOE Nuclear Energy User Facility, Launches Arco Supercomputer

“Arco gives us the ability to tackle scientific challenges at a scale and speed that was unimaginable before,” said Chris Ritter, director of INL’s Scientific Computing and AI division.

The Idaho National Laboratory Computing Facility was designated a U.S. Department of Energy Office of Nuclear Energy user facility on Nov. 18, becoming the first high-performance computing center in the country dedicated solely to nuclear energy research, inl.gov reported.

The designation, funded through the Nuclear Science User Facilities program, opens a continuously open call for researchers at universities, national laboratories, industry and federal agencies to seek no-cost access for non-proprietary work, Energy People reported.

It coincides with the launch of Arco, a GPU-accelerated supercomputer featuring Nvidia H200 GPUs in a Hewlett Packard Enterprise XD670 deep learning distributed memory system, which arrived at INL on July 30 and was officially launched to mark the user facility designation.

Arco pairs with Teton, a CPU-based system commissioned in January 2026 that contains 1,024 compute nodes with 384 cores and 768 GB of memory each, delivering 20.8 quadrillion calculations per second and quadrupling INL’s computing capacity, according to the American Nuclear Society. Together the two systems give researchers complementary CPU and GPU resources for modeling, simulation and AI workloads across reactor design, licensing, manufacturing, construction and operations.

“Making these computing resources available as a DOE Office of Nuclear Energy user facility gives researchers across the nuclear energy community access to capabilities they need to tackle complex challenges,” said Christian Natoni, deputy manager for Facilities, Programs and Partnerships at the DOE Idaho Operations Office, inl.gov reported.

The facility also supports INL’s leadership of Prometheus, a 32-partner collaboration that received a Genesis Mission award to deploy AI across the nuclear plant lifecycle.

Source 2 adds that the designation positions INL as a central hub for that work, which includes deploying super intelligence across nuclear power plant design, licensing, manufacturing, construction and operations.

Arco genesis valorant full skin full

Source 2 and Source 4 confirm the award and the scope of the collaboration, which spans design through operations.

Source 3 notes the designation is supported by the NSUF programme and opens a continuously open call for non-proprietary research and development.

Manyminded noted the announcement comes from an INL press release, so capability and impact claims are self-reported, and that no GPU count or detailed performance figures for Arco were provided. The benefit to reactor timelines is a hoped-for outcome, not yet demonstrated, the outlet added.