The Methodist Episcopal Church at Charleston was built in 1850 on land deeded by Henry Campbell, replacing a hewed log meeting house erected when the society organized in 1840 with eight or ten members, mercer.pagenweb.org reported.
William Glindwell was the contractor for the 1850 edifice. By that summer the congregation had grown to 75 members, according to records cited by pagenweb.org. William Miller served as the first class leader and was succeeded in turn by James Murdock, John Henderson, John Pierce, James Anderson, Henry Jennings, John Henderson Jr., B. Hughes and Jacob Zahniser.
The village of Charleston was laid out in the winter of 1838 by Henry Campbell, who sold lots for $25 each. Charles Beatty purchased the first lot and gave the village its name, pagenweb.org noted.
A graveyard laid off near the original log church around 1840 was later abandoned; most graves were removed to a cemetery one-and-a-half miles northeast of the village, the same source said.
Remodeling came in stages. The Ladies’ Aid Society added a room and kitchen and redecorated the auditorium in 1902. Asbestos siding was applied to the exterior around 1940. A new electric organ was installed in 1953.
In August 1955 the congregation began excavating beneath the building to create social and recreation rooms, pagenweb.org reported. Tractors donated by members and neighbors dug out the hardpan after pick-and-shovel work opened a section of the foundation wall. The entire hand-hewn stone foundation was removed and reset a section at a time. Locust posts from the church yard became floor supports, and the ceiling was finished with “homosote” and wood strips. The old foundation stones were encased in plywood to keep a rustic appearance.
A coal furnace was revamped and an oil furnace added for constant heat. A water system with two sinks and a hot water heater was installed, along with an electric stove, a bottled-gas stove and an electric warming unit for serving meals.
A shuffleboard court was painted on the floor and a ping pong table provided for recreation.
The former ground-floor kitchen was converted into rest rooms and a kindergarten room by tiling the floor and completely refinishing the walls.
Society organized and first building erected
Those histories noted the congregation was in good condition and had a comfortable house of worship at the time of writing.
Excavation launched the 1955 basement project
In August 1955 the congregation began work on a long-considered project to provide social and recreation rooms by excavating a section of ground 12 by 15 feet to accommodate a furnace and coal room, The Sun reported. Workers first removed a section of the foundation wall large enough to permit pick-and-shovel work before tractors donated by members and neighbors dug out the hardpan.
The excavation was then extended under the entire building, requiring the hand-hewn stone foundation to be removed and reset a section at a time, the same source said. Locust posts from the church yard became floor supports, the ceiling was finished with “homosote” and wood strips, and the old foundation stones were encased in plywood to keep a rustic appearance.