A University of Montana study finds that a hyperscale data center proposed for rural Yellowstone County would generate significant property tax revenue, potentially lowering mill rates for other taxpayers, while creating several hundred permanent jobs and a larger but temporary construction workforce.
The Bureau of Business and Economic Research modeled four facility sizes ranging from 500 to 2,000 megawatts at the Broadview site, where Quantica Infrastructure has proposed its Big Sky Digital Infrastructure Campus. The company has requested up to 7,235 MW of interconnection capacity, though it says the campus may not use all of it.
Construction impacts repeat with each phase
Each 500 MW phase takes two years to build. During each construction year the project would create about 500 direct jobs and support 1,500 jobs statewide when indirect effects are counted, increasing personal income to Montanans by $93 million annually, according to BBER.

Operations scale with capacity
Permanent employment and tax revenue rise with each increment of capacity. The study estimates the following annual operating impacts:
| Data center size | Direct jobs | Total statewide jobs | Personal income | Average annual property tax |
|---|---|---|---|---|
| 500 MW | 168 | 308 | $22.3 million | $26 million |
| 1,000 MW | 250 | 452 | $34.3 million | $47 million |
Results for 1.5 GW and 2 GW configurations are detailed in the full report. Operating jobs do not grow in direct proportion to data center size, BBER noted.
Property taxes drive public benefit
“Property tax payments from a hyperscale data center may be the greatest source of public economic benefit in Montana,” BBER director Jeff Michael said. “While the billions of dollars invested in computing equipment in a data center does not directly support Montana employment, the value of this equipment would drive enormous property tax payments, which ultimately help fund local government operations, public education and lower property tax bills for other Montanans.”
Because the taxable value consists largely of rapidly depreciating computer equipment replaced roughly every five years, assessed values swing sharply. A 500 MW center’s market value could fall from $15 billion to $5 billion over five years before new servers push the assessment up again.
The model assumes the facilities qualify for the 0.9 percent Class 17 tax rate created in 2017 and sit in the Broadview school district; a different location or policy change would alter the estimates substantially.
Power scenarios and local context
The analysis examined two power scenarios: a natural gas plant sized to the data center’s demand, and a hybrid pairing solar and battery storage with a smaller gas plant. The hybrid case would include one of Montana’s first utility-scale battery installations. NorthWestern Energy’s 2026 Integrated Resource Plan cites the state’s cool winter climate as a factor attracting developer interest.
What the study does not cover
Michael said the report does not address environmental effects or other potential community impacts. Its objective was to study economic impacts in the unique context of the Montana economy, which lacks substantial IT equipment manufacturing or a specialized data center workforce. Most advanced chips and specialized labor enter the state as imports rather than local production, the model notes.