Empty for more than six years, Boise’s historic Lowell Pool moved a step closer to reopening on Tuesday night as North End residents reviewed two distinct architectural concepts for the landmark.
The facility has remained shuttered since 2020 due to city safety and accessibility concerns. City officials presented plans carrying an estimated $9.4 million price tag to restore the property, which opened in 1953 and holds a listing on the National Register of Historic Places.
Both design options seek to bring the aging recreation site into compliance with the Americans with Disabilities Act while overhauling mechanical and structural systems. A new support building is planned behind the pool under both proposals, though the layouts differ significantly in how they handle the pool basin and surrounding deck area.
One proposal attaches new components directly to the existing structure at the back of the facility. The alternative design calls for a larger expansion extending onto the main pool deck.
The city’s Parks and Recreation Department owns and operates six outdoor pools across Boise. Lowell Pool and South Pool stand as the oldest facilities within that municipal system, prompting years of public outreach and planning before Tuesday’s design unveiling.
A public engagement process ran from November 2021 through May 2022, gathering neighborhood feedback through community surveys that drew 1,869 responses for Lowell Pool and 2,167 responses for South Pool, according to the City of Boise. Project consultants at Agnew::Beck compiled those findings to guide municipal leaders.

The city approved formal restoration plans for Lowell Pool in 2024. Feedback gathered at Tuesday night’s community meeting will directly shape which of the two architectural concepts moves forward.
City officials have not yet announced a timeline for when construction will begin or which specific design has been selected. North End residents and pool users can monitor follow-up announcements from the Boise Parks and Recreation Department as the project transitions from concept review to final planning.