The Colorado Department of Transportation kicked off a multi-highway improvement program across Larimer County this week, putting crews to work on eight separate segments stretching from the Estes Park valley to the Interstate 25 corridor north of Loveland.
CDOT announced the start of construction Monday in partnership with HCG Construction, framing the work as a safety and functionality upgrade for routes that carry a mix of daily commuters, freight traffic, and seasonal visitors to Rocky Mountain National Park. The project carries a completion target of winter 2027.
Crews will tackle four locations in the Estes Park area first: Colorado Highway 7 at Lily Lake between mile points 6.35 and 6.47; U.S. 36 at Community Drive at mile point 1.02; and two segments of U.S. 34 — at MacGregor Avenue (mile points 62 to 62.5) and Steamer Drive (mile points 62.81 to 63.18).
Work then shifts to the Loveland area: U.S. 287 at Hawg Wild Road (mile points 329 to 330); U.S. 34 at Cheyenne Avenue (mile points 93 to 93.5); Interstate 25 north of Loveland (mile points 260.23 to 261.2); and Colorado 392 at I-25 (mile points 99.87 to 101.13).
The scope covers sign replacement, curb and gutter removal and replacement, asphalt overlay, cable barrier removal, erosion control, and fresh striping. CDOT said the upgrades will improve roadway safety and functionality for the traveling public.
Motorists should expect daytime lane and shoulder closures from 7 a.m. to 5 p.m., Monday through Friday, with night operations possible Sunday through Thursday from 6 p.m. to 5 a.m. when necessary. The department urged drivers to slow down, leave extra following distance, and check COtrip.org for real-time conditions.
Construction schedules could change depending on the weather in the Estes Park segments of CO 7 and US 34. CDOT noted schedules could change depending on the weather.
Interstate 25 north of Loveland from MP 260.23 to MP 261.2 is included in the project locations near Loveland. CO 392 at I-25 north of Loveland from MP 99.87 to MP 101.13 is among the project locations near Loveland.
Travelers are urged to “know before you go.”
CDOT resources include: Remember: Slow For The Cone Zone. Do not speed in work zones. Obey the posted speed limits. Stay Alert! Expect the unexpected. Watch for workers. Drive with caution. Don’t change lanes unnecessarily. Be especially alert at night while driving in work zones. Expect delays, especially during peak travel times. Anticipate lane shifts and merge when directed to do so. Be patient!
The COtrip Planner mobile app offers real-time updates for iOS and Android devices.
The Colorado Department of Transportation traces its roots to a 1909 highway bill that created a three-member Highway Commission, which first convened on January 1, 1910. The agency was renamed the Colorado Department of Highways in 1953 and adopted its current name in 1991 to align with federal transportation authorities.
Today CDOT maintains the state’s 9,144-mile highway system, including 3,429 bridges that carry over 28 billion vehicle miles of travel each year. It also operates the Bustang intercity bus service and supports regional systems such as the Flatiron Flyer.
Work is expected to be completed winter 2027.