In a recent opinion column published by The Post and Courier, the editorial board argues that Charleston must break its reactive pattern of upgrading street safety only after fatal accidents occur.
For years, safety improvements across the city have materialized largely in the immediate wake of tragedy. Yet recent funding commitments and emerging coordination between local and state officials suggest an opening for lasting change.
The column points to a grim chronology of fatal incidents. In 2019, a pedestrian was killed crossing Maybank Highway between the Pour House and the Terrace Theater. A study followed, but the resulting safer crossing was only completed after a 74-year-old pedestrian was killed in December crossing the street.

Following a hit-and-run on a sidewalk-less part of Morrison Drive in April 2024 that claimed the lives of two young women from Simpsonville who were heading back to an apartment, sidewalks were subsequently built. This past spring, a woman was hit and killed by an SUV while she crossed Broad Street, triggering an ongoing safety upgrade study.
The city was prompted to boost crosswalk visibility and restrict parking nearby after a child crossing King Street to reach James Simons Montessori School was struck a few weeks ago, though thankfully escaping serious injury.
These mounting dangers prompted Charleston Mayor William Cogswell to heed requests from residents—including Dr. Jack Simmons, whose wife was the woman fatally struck on Broad Street—by recommending $1 million for pedestrian safety in the 2027 budget. Kailey Cota of The Post and Courier reported that this figure more than doubles the traffic safety allocation found in the current city budget.
While the city recently missed out on a $4 million federal Safe Streets for All grant, local funding got a major boost with this month’s extension of the Charleston County transportation sales tax. Out of a $4.25 billion total, $77 million is designated for countywide bike and pedestrian projects, including $22 million specifically within the city of Charleston, alongside a new Complete Streets pledge.

Bridging the gap between the city and the S.C. Department of Transportation remains vital, as the state owns and maintains many downtown thoroughfares. Charleston’s Traffic and Transportation director Michael Mathis notes that collaboration is probably better now than it has ever been, though coordination on projects like pavement markings at King and Grove still requires state approval and time.
Mr. Mathis mentions that although the state and city are collaborating to achieve a fast turnaround, the physical labor itself remains a few months away.