MoDOT Outlines mid-Missouri Roadwork From Nov. 16 to 22

Drivers across mid-Missouri face a sprawling network of interstate closures, bridge maintenance, and highway construction from Nov. 16 to Nov. 22, according to the Missouri Department of Transportation.

The Missouri Department of Transportation outlined projects spanning rural routes, state highways, and major interstates. Crews will handle pothole patching, mowing, brush cutting, striping, and pavement repairs alongside active construction zones. Interstate 70 will see intermittent and long-term single-lane closures as part of the ongoing Improve I-70 program. Drivers were advised to remain alert for slow-moving equipment and check the MoDOT Traveler Information Map for updates.

Boone County bears a heavy share of the weekly slate. Drivers will encounter an overnight shutdown on the westbound off-ramp from I-70 leading to Route BB, effective from 7 p.m. to 6 a.m. Nov. 17. Nov. 17. Crews are shifting traffic onto newly constructed lanes in the median to reconstruct existing westbound lanes.

The westbound on-ramp from U.S. 40 to I-70 shuts down around-the-clock from 7 p.m. Nov. 17 through 6 a.m. Pedestrian upgrades continue from Route PP, also known as Clark Lane, in Columbia to Range Line Street from Nov. 17 to Nov. 30, with one lane remaining open.

Infinity loop infographic diagram with step circular process and business workflow vector

Pavement upgrades hit Route Z just south of I-70 near I-70 Drive SE on Nov. 18, keeping one lane open. Missouri 124 continues to see guardrail and signing installation through Nov. 20, from U.S. 63 to Fayette. Bridge painting on the Wagon Trail Road bridge over U.S. 63 requires single-lane closures through November.

Bridge construction keeps Providence Road over I-70 shut down, while both the eastbound on-ramp and the new bridge are anticipated to open sometime in November. Pedestrian signal improvements on Business Loop 70 from Old Route 40 to Providence Road run through December. Business Loop 70 also closes nightly underneath I-70 from 7 p.m. to 6 a.m. as needed through December.

Callaway County motorists face sign work overnight on U.S. 54 from 7 p.m. to 6 p.m. Nov. 16, closing one eastbound lane from the Missouri River Bridge to north of Route W. Route Z closes for a culvert replacement from 8 a.m. to 4 p.m. Nov. 18 within Fulton city limits east of Wood Street.

Callaway county map

Camden County sees roadside work on Route TT from Nov. 16 to Nov. 20 with one lane open. Cooper County reports pavement repairs on Missouri 87, or Main Street, in Boonville from Nov. 17 to Nov. 18 between Elm and Sycamore Street.

Maries County bridge maintenance affects Missouri 42 over the Gasconade River east of Vienna from Nov. 16 to Nov. 20. Miller County road projects involve bridge maintenance on Missouri 17 over the Osage River east of Tuscumbia and Business Route 54 over Blythes Creek in Eldon.

Moniteau County schedules shoulder work on U.S. 50 and culvert replacements on Missouri 87 from Nov. 16 to Nov. 20. Morgan County initiates a culvert replacement on Route N on Nov. 16. Osage County plans shoulder work in Chamois on Missouri 100 from Nov. 16 to Nov. 19.