The Jacksonville Downtown Development Review Board voted unanimously Thursday to grant final design approval for Building 1A, the 190,388-square-foot flagship that will anchor the University of Florida’s new graduate campus in LaVilla.
The decision clears the way for construction to begin this winter on a 2.34-acre parcel bounded by West Bay, West Forsyth and North Lee streets. The board’s action applies specifically to this first phase and its associated public-space improvements; future phases will require separate reviews.
“This approval marks a pivotal step forward in establishing a world-class graduate and research presence in the heart of Jacksonville,” said Mori Hosseini, chair of the UF Board of Trustees.

The building will rise six stories on the west side and eight on the east, topping out at roughly 135 feet. Its contemporary envelope combines metal panels, expansive glass curtain walls and vertical sun-shading fins. Ground-floor retail, public plazas, landscaped lawns, shaded seating, balconies and accessible roof terraces are designed to keep the streetscape active and permeable.
A Three-Year Conversation With LaVilla
The unanimous vote followed more than three years of outreach that included over 100 meetings and presentations with neighborhood advocates, civic organizations and LaVilla leaders. That process shaped the pedestrian pathways and public spaces that now stitch the campus into the existing downtown street grid, with vehicle access and parking concentrated along the eastern and southeastern edges of the site.
LaVilla, a historically Black neighborhood north of the core, has seen waves of redevelopment in recent years. Supporters frame the campus as an economic catalyst; community advocates pressed for the street-level connectivity and public space the approved plan now includes.
Programs, Research and the Building Next Door
When fully built, the campus will offer master’s degrees in business administration — including an MBA tailored for working professionals — engineering, management, computer science, architecture, biomedical and health science artificial intelligence, and a master of studies in law. It will also house the Advanced Research for National Security Laboratory, positioning the region for defense-related research.
Building 1A sits adjacent to UF’s recently renovated facility at 801 W. Bay St., which opened for classes in September 2026. That existing building gives the university an immediate foothold while the flagship rises.
Timeline: From Site Selection to Groundbreaking
| Date | Milestone |
|---|---|
| December 2024 | UF Board of Trustees unanimously approves LaVilla site |
| November 2025 | Jacksonville City Council approves final land transaction 17–0 |
| September 2026 | Renovated 801 W. Bay St. facility opens for classes |
| November 19, 2026 | DDRB grants final design approval for Building 1A |
| Winter 2026–2027 | On-site construction of Building 1A scheduled to begin |
The city committed six properties totaling 25.28 acres to the campus. Edgemoor leads a delivery team that includes HOK, PQH Group Design, OJB Landscape Architecture, Clark Construction Group, Auld & White Constructors, England-Thims & Miller, Community Planning Collaborative and Coastal Connections Group.
LaVilla, a historically Black neighborhood just north of the downtown core, was once known as the “Harlem of the South” for its vibrant arts, culture and entrepreneurship. It is the birthplace of James Weldon Johnson and John Rosamond Johnson, who composed “Lift Ev’ry Voice and Sing” at their LaVilla home between 1900 and 1905.
The city honored that legacy with the 2020 design unveiling for Lift Ev’ry Voice and Sing Park at 120 Lee Street, conceived by MacArthur Fellow Walter Hood as a cornerstone of a broader LaVilla Heritage Trail. The neighborhood has seen recent redevelopment including the Jacksonville Regional Transportation Center and new affordable housing such as the Lofts at LaVilla and Lofts at Monroe.
What Comes Next
Construction fences will go up around the Bay, Forsyth and Lee street frontages this winter. The next major public milestone will be the design review for the campus’s subsequent phases, which have no fixed schedule yet.