The University of Kentucky opened its new $27 million Environmental Quality Management Center (EQMC) on Nov. 17, 2026, consolidating hazardous waste operations and safety departments into a single 36,000-square-foot facility, according to UKNow.
The project replaces the university’s previous facility, which was originally expected to be completed in August 2026, according to the Kentucky Kernel.
The new center houses the university’s Environmental Health and Safety (EHS) departments, which previously operated from separate locations across campus. The facility features two integrated wings: a two-story office wing for Environmental Quality, Occupational Health, Research Safety and the Fire Marshal, and a one-story wing for hazardous waste processing.
“Bringing Environmental Health and Safety together in the Environmental Quality Management Center is about more than sharing a location,” Brandy Nelson, acting executive director of Environmental Health & Safety, said. “It gives our teams greater opportunities to collaborate, share expertise and better support the safety and environmental needs of the UK community.”
Nelson added that the inclusion of dedicated spaces for training and simulation will allow the university to continue building practical learning opportunities for faculty, staff and students.

The facility’s design incorporates its location alongside elevated railroad tracks. The second floor of the office wing sits at approximately the same height as the tracks, featuring triple-paned, sound-deadening glass to minimize noise from passing trains.
“The windows are triple-paned, sound-deadening glass, so you can hardly hear the train, but have a perfect view of them passing. It makes for a very interesting second floor space,” Joe Kane, the Capital Construction Project Manager, said. Kane said that the hazardous waste wing is critical for safely handling waste streams from campus buildings, research labs, the current UK Chandler Hospital and future expansions.
According to the university’s website, the facility oversees air quality monitoring and water management protocols to ensure full adherence to federal and state environmental regulations.

The consolidated facility also manages the hazardous waste disposal needs for all campus and HealthCare units. This unified approach will provide a smooth transition from the previous site while maintaining continuous oversight of the university's safety requirements.
The shift to the new EQMC follows a broader campus pattern of relocating support infrastructure to prioritize clinical growth.
In addition to the primary parking changes, the project team incorporated extra loading zone and service vehicle spaces to support the facility’s daily logistics. These infrastructure adjustments are designed to streamline how the university handles its waste streams and provides essential safety services to its growing research and hospital sectors.
The previous EQMC facility is slated for demolition to provide space for the planned expansion of the University of Kentucky Albert B. Chandler Hospital.